Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13621950
| No.13621950
- Product Categories
- Friendly Links
| Information Name: | Jiangsu galvanized steel springboard procurement, supply, supply manufacturers |
| Published: | 2014-12-03 |
| Validity: | 360 |
| Specifications: | 1500 * 250 * 50 * 1.5mm |
| Quantity: | 100000.00 |
| Price Description: | |
| Detailed Product Description: | Steel springboard to install, use and removal of many steel springboard use customer, do not know the specific installation, use and removal method for steel springboard. To this end finishing a series of R & D personnel we use the rules of building components Ltd. Jiangsu Rays. Steel springboard before installation, you should check block by block, such as the quality does not meet the requirements should be promptly repair or replacement. Steel pipe springboard small bar (2m small bar) maximum spacing of 1.5m, steel springboard joints must install two small bar, their mutual distance should be no more than 0.3m, steel springboard ends hanging out part should not greater than 0.15m (as shown in Appendix V), when the former is not all fixed, non-laying steel springboard. Jiangsu Rays steel building components Co. springboard require customers to be paved, paved, paved steady, block by block, from one end of the scaffold in order laying springboard steel scaffolding and scaffolding small ends of the crossbar must be fixed. Flat Road and chute steel springboard, if steel hook type or jack springboard, each interval to be with a small bar fixed scaffolding, which uses hook-type connection or use other types of connections; such as the use of U-type card connector Steel springboard at intervals of about 15m and a small bar fixed scaffolding. Steel springboard laid, after inspection and approval before use. Laying steel chute springboard, construction should be based on local conditions, to take appropriate measures to slip. Such as construction material handling chute, walking trolleys, non-slip measures should be adopted; such as construction workers up and down the chute channel and handling small parts, can be inclined ladder lattice measures. When removing the steel springboard springboard use either steel construction, steel or ship springboard springboard steel chemical use, building components, Ltd. Jiangsu Rays require construction workers use ropes to pass down or sliding down the chute into operation, down from a height is prohibited throw. Steel springboard after the removal, in the handling process to gently press the specifications were neatly stacked against arbitrary cross-stacked, avoid weight steel springboard heap pressure and deformation. Company: Jiangsu Rays building components Co., Ltd. Contact: Mr. Zhou 18796779198 0523-87838785 QQ: 2819163822 Alibaba: Jiangsu Rays building components URL: www.xg-js.com www.jsxggj.com The company produces a variety of high quality steel springboard building springboard springboard marine sand drain, steel scaffold boards, etc., are welcome to inquire procurement. |
Admin>>>
You are the 4658 visitor
Copyright © GuangDong ICP No. 10089450, Building Component Co., Ltd., Jiangsu Rays All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 4658 visitor
Copyright © GuangDong ICP No. 10089450, Building Component Co., Ltd., Jiangsu Rays All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

